Wall-mount - Upper and lower bracket locations aligned and mounted first
- Upper bracket screw holes on the bottom
![](https://s3.amazonaws.com/cdn.freshdesk.com/data/helpdesk/attachments/production/33062182138/original/mQ78iCutFSpb20dgLjjqkSYV7TRzebBjVw.png?1626935421)
- Cabinets are installed before system control box is installed
- After upper and lower brackets installed, Cabinet "C" installed in the center position first.
- Next, Cabinets "B", "D", "E", "A" installed in this respective order
| Floor-stand - Bottom cross beam attached to left-right supports, then top cross beam
- Relocate original mounting bracket from the top to the middle. Mounting bracket screw holes on top
![](https://s3.amazonaws.com/cdn.freshdesk.com/data/helpdesk/attachments/production/33062182714/original/SuUJikzP1Gs24oACLYPsMOLlyhDr-2uNHQ.png?1626935987)
- System control box installed before cabinets are installed
- After upper and lower brackets installed, Cabinet "B" installed just left of the center-position first.
- Next, Cabinets "B", "D", "E", "A" installed in this respective order
|
Recommended Links
"How do I install a DVLED display with a Floor Stand configuration?"
"How do I install a DVLED display with a Wall-mount configuration?"