Notre suite complète d’outils propose des solutions performantes adaptées à tous les cadres pédagogiques pour dynamiser l’apprentissage.
Explorez une vaste collection d'articles, de ressources et d'actualités dédiés à l'enrichissement des expériences éducatives grâce aux solutions EdTech innovantes.
To ensure a seamless installation, a comprehensive assessment of the mounting location, structural integrity, power supply, and site logistics is mandatory.
Steps and Checklist:
Installation Environment
Define the exact mounting location and ensure there is ample room for equipment (e.g., tools, ladders, scaffolding).
Power and Cabling
Dedicated Circuit: Ensure the power outlet is separate and not shared with other appliances.
Cable Management: Determine if cables will be hidden behind the display or visible.
Structural Assessment
Identify wall type (block, drywall, plaster, wood, or metal studs).
Reinforcement: Verify if the wall can support 300lb+ (135kg+). Reinforcement may be required if the wall doesn't meet safety standards.
Logistics and Access
Confirm elevator access (freight or standard) and ensure dimensions can accommodate the display components.
Note:
Installers or resellers should seek explicit clarification from the end-customer on these points prior to the installation date.